• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

steve rudkin electrical

SPECIALIST ELECTRICAL CONTRACTORS FOR ALL YOUR DOMESTIC, COMMERCIAL AND INDUSTRIAL NEEDS

  • Twitter
  • HOME
  • ABOUT
  • LATEST PROJECTS
  • SERVICES
    • Domestic Services
    • Commercial Services
    • Industrial Services
    • Solar PV
    • Retail
    • Testing
  • ADDITIONAL
    • Free hot water
    • Surge Protection
    • Landscape, Garden and Security
    • Power Monitoring
    • Infra Red Heating
  • CONTACT

Electrical installations near completion at bike shops

July 10, 2019 By Steve Rudkin

We are currently doing 2 bike shop installations using a surface mounted system, this image shows cable trays going in.

This store has a concrete ceiling and is nearing completion, suspended lighting track system with led battens and spots clipped into the track.

Filed Under: Latest Projects

Primary Sidebar

QUICK LOOK AT OTHER PROJECTS

Retrofitting voltage optimization solar systems to older existing ones

We are regularly retrofitting a fantastic voltage optimization solar system  to older existing  systems producing extra energy adding to the annual yields for the customer.

Solar Grantham April 2015

Solar Installation in Grantham

The inverter being installed on a solar job in Grantham.

infra red heating panel in shop - Steve Rudkin Electrical Contractors Ltd

Infra red heating panel install in local shop

Linecross

Linecross is one of Europe’s leading manufacturers of polymer and polyurethane composite products. They provide services to a range of markets from their commercial units in Rutland and Cannock. These properties are home to a series of sophisticated machinery used for product manufacture. The team at Steve Rudkin Electrical Contractors have a longstanding relationship with […]

LED lighting in local Stamford shop

LED lighting in local Stamford shop

LED feature and display lighting fit out.

Completion at Rutland Cycling's new store at Ferry Meadows, Peterborough.

Rutland Cycling’s new Ferry Meadows store open

Completion at Rutland Cycling’s new store at Ferry Meadows, Peterborough.

Completion of new offices at Cannock Staffordshire

Completion of new offices at Cannock Staffordshire

Lighting in bricklayers tent - Steve Rudkin Electrical Contractors Ltd

Bricklayers training tent lighting – LED lighting install

First and second fix at Rutland Cycling, Ferry Meadows

First and second fix at Rutland Cycling, Ferry Meadows

Installation at Rutland Cycling’s new store at Ferry Meadows, Peterborough.

Electric works at exotic pet centre

Exotic Pet Centre

The aim of this project was to save energy, reduce CO2 emissions and save money also. We fitted this state of the art facility with LED lighting throughout, infra red heating panels and solar panels on the roof.

More Posts from this Category

Footer

Steve Rudkin Electrical
Contractors Limited
Unit 5
Casterton Road Business Park
The Old Great North Road
STAMFORD
PE9 4EJ
T: 01780 763415

Home
About Us
Latest Projects
Services
Contact Us
Privacy Policy

  • Twitter

Data Protection

As you may be aware the new EU General Data Protection Regulation (GDPR) came into effect on May 25th 2018. As part of our compliance obligations we are providing organizations and clients that we work with, Our Company Policy relating to GDPR.

Please click here to read our Privacy Policy.

Copyright © 2019 · Steve Rudkin Electrical Contractors Ltd.